Saturday, November 27, 2010

It's Been Two Weeks....And You Won't Believe The Difference!

It's been two weeks since I last posted on here. We've been flat out at the house installing insulation in the internal walls to act as sound deadening in certain areas and also installing brackets in the eaves so that our patio will easily attach. In that time so much has happened, but with the end of the school year approaching and being at the block until 7pm at night its been impossible to get on here to show you what has happened.

This past fortnight has seen our roof go on, the baths installed, the windows fitted, the bricks put up and the plaster sheeted and set. This week we are up to the cornice and what I can only presume is getting ready for lock up. Our kitchen and laundry will be fitted at the end of the week and on Monday I am off to select feature tiles, handles and lighting. It's all very exciting.

With any luck our Site Supervisor hopes to have the house painted and tiled before Christmas which means that after their return from holidays there won't be much left to do before we can move it.

Here are some photos to show what our house looks like this weekend.

Our bedroom looking through to our ensuite and WIR.


Our bedroom


From the front doors through to the theatre. Coral do a lovely coffered ceiling in their entries and we plan on hanging a feature light in this area.


From the entry to the meals room


Front of the house. Our doors will be painted high gloss black and the portico will be rendered and painted in Surf Mist (which is the same colour as our fascia and garage door).


Looking from the back of the house to the front along the side that we'll have our patio and pool


Front of house


Garage side of house

No comments:

Post a Comment