Considering we had a three week break on our house over Christmas, January certainly turned into an eventful month. Not only have I completely neglected the blog, but with the flooding around SE Qld we didn't even really go out to the house that much until about last week.
We were very fortunate to not have been affected personally by the flooding at either this new home or the one we are renting. In fact, we went to see our new neighbours during the flood (when we could get out) and it seemed as if nothing was even happening in our little estate. Life was normal.
When the tradesmen were able to get back through to our house, they finished the painting, plumbing and electrical, installed the security screens and also the insulation and cleaned the place (better than I imagine it will ever see!). And that has just been in the last two weeks. Again, we can't speak highly enough of Coral and their commitment to not only the quality of our job but the ability to do it quickly.
I've included a few photos to show the progress, but they aren't very good and therefore would rather wait until I have taken proper ones on the camera.
We think that the main floor tiling may start this week which is very exciting. We don't have a finish date at this stage but things are looking very close. I will take more pictures this week and update ASAP.
Our entry feature light
The kitchen
Our ensuite
Our entry hallway
The black front doors
The front of the house with it's new lights.